BETONPARTSDiagnosis sheet · https://betonparts.com/en/faults/cement-silo/overload-trips/
Cement silos and screw conveyors · Screw conveyor
Overload trips after 5–10 minutes
- Symptom
- Overload trips after 5–10 minutes
- Likely cause
- Mechanical drag, low voltage, or loose terminals.
- Check
- Running current against the setting; supply voltage.
- Fix
- Remove the cause; set the overload to the motor plate.
Manual · Book 2 · § 13.7
Parts you may need
⚠ Every look inside, turn by hand or open step means full lockout first. Never enter a silo or a bin with material in it.
Plant / site
Machine and serial no.
Date
Checked by
Findings and actions
Questions or parts: info@betonparts.com · WhatsApp +905073288473 · quote within 24 working hours